Skip to main content

How much will it cost to build the UHW Lakeside Wing?

The capital costs have been allocated at £33M to design and build UHW Lakeside wing.

The operational costs of running the facility will fluctuate dependent upon capacity and volume of patients and staff.

These will be fully audited and accounted for as part of the UHB’s response to Covid-19.

Follow us: